Requirements on Developers and Public Water Authorities
By Neil Wilcove and Will Tate


On June 2, 2010, Governor Sonny Perdue signed the Water Stewardship Act of 2010 (the "Water Act"). The Water Act contains several new requirements concerning developers and builders. The first, codified at O.C.G.A. § 12-5-180.1(c), requires all multifamily residential buildings permitted on or after July 1, 2012 be constructed so as to allow metering of the water usage of each unit. However, this requirement does not apply to renovations of multifamily residential buildings or to reconstruction subsequent to a casualty or condemnation.

The second requirement is codified at O.C.G.A. § 12-5-180.1(d). This section of the Water Act extends the requirement for individual unit metering to multiunit retail and light industrial buildings. This section applies to all multiunit retail and light industrial buildings permitted on or after July 1, 2012. Of note, the Water Act contains an exception for office space. Multiunit office buildings and office units within a mixed-use development are not required to provide for individual metering of water usage.

Another requirement concerning developers and builders is codified at O.C.G.A. § 8-2-3. This section of the Water Act requires the use of high efficiency plumbing fixtures in new construction permitted on or after July 1, 2012. The table below summarizes the fixtures affected by the Water Act and the corresponding specifications for water usage.

Fixture

Maximum Water Usage

Dual Flush Toilet

1.28 gal/flush (for either 2 reduced volume flushes or one full volume flush)

Single Flush Toilet

1.28 gal/flush

Urinal

0.5 gal/flush

Lavatory Faucet/Aerator Replacement

1.5 gal/min @ 60 psi

Shower Head

2.5 gal/min @ 60 psi

Kitchen Faucet

2.0 gal/min

Further, the Water Act prohibits the sale of toilets with a per flush water usage of higher than 1.28 gal/flush after July 1, 2012.

For more information, please contact Mr. Wilcove at [email protected] or Mr. Tate at [email protected].



Articles

Supreme Court Issues Three Important Decisions

Requirements on Developers and Public Water Authorities

The Evolving Duty to Settle: A Foundation Made of Shifting Sand

Legislative Update

Local Governments Should Consider SPLOST Tax in Difficult Economic Conditions


Learn more about FMG

CGL and Business Liability

Commercial and Complex Litigation

Construction and Design Law

Financial Services and Securities

Insurance Coverage & Bad Faith

Government Law

Labor and Employment Law

Professional Liability / Errors and Omissions



Freeman Mathis & Gary, LLP
100 Galleria Parkway
Suite 1600
Atlanta, Georgia 30339-5948

Tel: 770.818.0000 / Fax: 770.937.9960

www.fmglaw.com


Copyright © 2016 Freeman Mathis & Gary, LLP Click here to print the article.